Rocker-type water intake floating dock pump ship is a floating water intake facility connected by a universal joint rocker arm. Its core design is to install universal joints at both ends of the water delivery pipe respectively, and use the flexibility of the joints to adapt to the ups and downs, bumps and swings of the hull. Compared with ordinary rubber pipes, the steel pipe rocker arm structure has higher water pressure resistance and longer service life (up to 500-5 million yuan investment scale).
The main technical parameters include:
Length of rocker arm: usually 10-50 meters, and the maximum span can reach 60 meters;
Applicable water level difference: the design is suitable for scenes where the high and low water level difference is more than 30 meters, especially for waters with steep bank slopes or water intakes more than 50 meters away from the shore;
Design of water delivery pipe: a single steel pipe is suspended to connect the shore-based main water pipe, and the steel pipe has the functions of water delivery and pedestrian passage.
2. Core advantages
Compared with the traditional floating water intake pumping station, the rocker design has the following outstanding advantages:
Engineering economy
There is no need for cofferdam construction or complicated civil works, and the total construction investment and maintenance cost are saved by more than 50%.
;
The greater the water level difference, the more obvious the benefit: the investment will be saved by 20% when the water level difference is 10 meters, and 40-50% when the water level difference is 30 meters.
.
Adaptive reinforcement
The rocker arm structure is used to solve the problem of water intake with large water level drop (≤40 meters) and rapid fluctuation of water level;
The water intake is always 1.5-2 meters below the water surface, and the water quality is better than that at the bottom of the fixed pumping station.
Management convenience
Equipped with automatic control system, it can be operated by lifting tools on board during maintenance, and the parts can be operated without water.
;
Modular design is convenient for rapid deployment, and the construction period is only 100-200 days (depending on the scale).
.